NATIONAL CULTURAL MONUMENT DEVIN CASTLE - PUBLIC ACCESS TO THE UPPER CASTLE

NKP Devín
 

 
 

Logo

 


Project of the Capital City of the Slovak Republic Bratislava
  • aimed at making the Upper Castle again accessible to the public, reconstruction of communication system from the Middle Castle to the Upper Castle, construction works on middle and upper terrace, and restoration of the exposition located in underground cave spaces of the castle cliff
  • financially supported with European Economic Area Financial Mechanism within SK05 Conservation and Revitalisation of Cultural and Natural Heritage Programme
  • total project budget of 517 376 € co-financed by EEA Financial Mechanism Grant in amount of 85 % costs - 439 770 € and co-financed by the Capital City of the Slovak Republic Bratislava in amount of 15 % costs. Total sum of reported eligible costs of the project realised in 11/2014 - 4/2017 reached 510 631,16 € including 434 036,71 € eligible 15% co-financing  from EEA grant and 76 595 €  sum of 15% co-financing of the Capital City of the Slovak Republic Bratislava. Expenditure of the project grant reached 98,7%.
In addition, the City of Bratislava increased in 2016 own budget by approx. 230 000 € for financing additional “2nd phase of the project” reconstruction works, carried out in 2016 – 2017. The 2nd phase of the project included necessary reconstruction works not foreseen in the project from 2014 year.

Project activities: 

  • clearing of the castle cliff and architectures of the Upper Castle out of self-seeding trees and rock debris using mountain-climbing techniques, and placement of monitoring system for detection of drifts of unstable parts of the castle cliff: realisation 10/2015 – 12/2015, clearing of the castle cliff out of self-seeding trees: realisation 3-4/2017
  • reconstruction works for monument preservation of the castle constructions in part of the national cultural monument area : realisation 02/2016 – 6/2016
  • restoration of the exposition located in underground cave spaces of the castle cliff: realisation 7/2016 - 04/2017 

Project duration:  11/2014 – 04/2017  Reconstruction works: 10/2015 – 04/2017

Grant recipient: Capital City of the Slovak Republic Bratislava    / Hlavné mesto Slovenskej republiky Bratislava / www.bratislava.sk

Project partners:

  • City Museum Bratislava
  • General Investor of Bratislava
  • Archaeological Institute of Slovak Academy of Science
  • Faculty of Philosophy - Comenius University, Department of Archaeology
  • Geological Institute of Slovak Academy of Sciences
  • Municipal Monument Preservation Institute Bratislava
  • Faculty of Natural Sciences - Comenius University, Department of Engineering Geology

Project realisation – period 11/2014 – 4/2017: During 2015 year, public procurement and contracting the suppliers of the works were carried out. 

In October 2015 started works aimed at making the Upper Castle again accessible to the public, with intend to making the public access to the Upper Castle.

Monument-protected object of the Upper Castle is part of the area of the National Cultural Monument Devín - Slavic Castle site in Bratislava. The area is monument-protected, where all actions and activities are subject to supervision of the state monument protection institutions. The castle cliff is protected natural monument.

In October – December 2015 clearing of the castle cliff and architectures of the Upper Castle out of self-seeding trees and rock debris using mountain-climbing techniques, and placement of monitoring system for detection of drifts of unstable parts of the castle cliff, on which the monument of the Upper Castle is located, were realized.  Clearing of the castle cliff and architectures of the Upper Castle of approximately 18 000 m² area with superelevation of cca 40 – 70 metres has provided clearing of cliff out of self-seeding trees and rock debris and placement of monitoring system for detection of drifts of unstable parts of the castle cliff using mountain-climbing techniques.  Further, clearing of the castle cliff out of self-seeding trees realised in March – April 2017.

Reconstruction of the upper part of the castle – reconstruction works consisting in monuments renovation of the castle constructions of the Upper Castle part of the national cultural monument area were realised in February – June 2016. 

In second half of 2016 were carried preparatory works, consultations and technical scenario for restoration of the exposition located in underground cave spaces of the castle cliff. The works on the exposition “Devin Castle in 13 – 20 Century” realised consequently in January - April 2017.

Project completion: 30 April 2017

Opening ceremony:  5 May 2017

After the restoration works completion and restoration and installation of the new exhibition located in underground cave spaces of the castle cliff, the visitors of the Devin Castle have access to the Upper Castle and to the exposition from 6 May 2017.

Link European Economic Area Financial Mechanism – EEA grants in Slovakia: http://www.eeagrants.sk/http://www.eeagrants.sk/5-en/uvodna-stranka

Published PROJECT AGREEMENT for project realisation from grant within SK05 Conservation and Revitalisation of Cultural and Natural Heritage Programme: 

 
Responsible: Mgr. Zuzana Masárová
Created / changed: 19.10.2017 / 19.10.2017